From Canberra warehouses to Beijing towers.
- Multilevel factories
- Warehousing
- Commercial offices
- Multistorey residential
- Multilevel parking structures
Corcon was developed from the late 1970s onward as an Australian construction design innovation, later refined into a licensed structural product. Founder Andy Stodulka spent roughly a decade and an estimated $500,000 building relationships in China before securing a partnership with the China Academy of Building Research — a semi-government body Stodulka has described as the Chinese equivalent of CSIRO building research.
To help bridge that relationship, the company recruited Chinese-speaking postgraduate students from the Australian National University. By 2006, Corcon had identified two prospective large-scale projects then under negotiation: a 76-storey tower in Moscow and a 500,000 m² development in Beijing — evidence of the system's applicability at major international scale. The China push drew support from both ACT and Australian federal government grant programs.

“Making waves with corrugated concrete”
By Kanchan Dutt. Business, Monday Profile, 2006, p.4 — the newspaper profile quoted above, reproduced here from the original clipping.
Read the full article
Signing ceremony, Langfang, China
Andy Stodulka and Chinese partners formalising a CORCON project agreement in Langfang, Hebei province — 1 November 2005. Photographed for Corcon's Langfang project archive, which also documents load-bearing capacity testing carried out there.
From a two-storey house in Queanbeyan to 250,000 m² of housing in Quezon City.
CORCON's project record runs from the first Australian slab in 1995, through licensed use with IJM in Malaysia and F.Q. Esteban and Associates in the Philippines, to the China and Botswana projects covered in detail below.
The first CORCON slab was installed in a two-storey home in Queanbeyan, NSW, in March 1995. An early medium-density development in the Canberra suburb of Kingston used 1,300 m² of the system, placed by Multi-Span Formwork Pty Ltd. More than 20,000 m² of CORCON has since been placed across the ACT, and a contractor in Darwin reported savings of up to $80 per m². DCI's work in the ACT also includes the Pomegranate restaurant fit-out in Kingston.
In 1999, Decoin entered the Guinness Book of Records by casting a 14 m post-tensioned CORCON slab with an average thickness of only 140 mm and 3 kg of cable per m². The slab carried a load of 300 kg/m² with no measured deflection — full span and load tables for the system are on Design & Specs.



A month ahead of the hollow-core schedule, on the critical path.
IJM, a multinational construction company with an annual turnover of more than RM 1 billion, introduced CORCON into Malaysia in 1998 through Crendon Building Systems, its industrialised building systems division — citing finish quality and construction speed as the main reasons.
A first 20 m² test area with a 6 m span was loaded to 500 kg/m² with no noticeable deflection or cracking. IJM then built a 4,000 m² multi-level car park in Kuala Lumpur in three months using 500 m² of CORCON formwork, reused repeatedly across the structure.
At the same time, IJM completed a 6,000 m² multi-level car park for a condominium in two months using 1,000 m² of CORCON — against three months scheduled for a hollow-core slab system, finishing a month early on the critical path.
With reduced cost, strong performance and positive feedback from the client, architect, consultant and subcontractors, IJM went on to promote CORCON for car parks, shopping malls, and commercial and industrial buildings in Malaysia.
500 m² of formwork, reused eight times, on a US$110 million housing project.
CORCON's Philippine debut was a Manila shopping centre; its largest Philippine deployment was public housing.
4,000 m² — a 50% saving
The first 4,000 m² of CORCON placed in the Philippines went into a Manila shopping centre, reusing 500 m² of formwork eight times over eight weeks — a reported 50% saving compared with a precast joist system.
250,000 m² — 6,000 units
CORCON was also selected to form a 250,000 m² slab for 6,000 housing units in the Payatas Housing Project — a US$110 million development, with F.Q. Esteban and Associates as consultants.
2,700 sqm, four floors, 45 days: reported by the builder, not by Corcon.
In 2003 DCI supplied 500 m² of the CORCON system to the ShanShuiMingYuan First Phase project for the Shan Shui Garden Club, Shandong province — the first CORCON deployment in Qingdao. The client's own site engineer, not Corcon, wrote up the results.
The project — sited between ShiLaoRen Village and ShiLaoRen Guangchang, backing a mountain and facing the sea — combined office, recreation, conference and accommodation facilities across a 65.1 m × 45.17 m footprint. Construction began in May 2003, and within 15 days of the first floor's formwork being prepared, the project imported CORCON's corrugated steel and beam-mould system from Australia for the first time in the city. Andy Stodulka travelled to Qingdao to personally supervise and train the local crew — from setting up beam moulds and end brackets through to the concrete pour, dismantling and crated storage for re-use. Despite the project's complexity, the structural works were completed in just 45 days.
Reused throughout the build, the project's 500 m² of CORCON formwork produced roughly 6,000 m² of built area — the same 12× reuse captured in the stats above — including 2,000 m² of pitched concrete roof.
The project's own site engineer then wrote a formal comparison between CORCON and the traditional steel formwork it replaced:
CORCON vs. traditional steel formwork — Qingdao site engineer's comparison
| Factor | CORCON | Traditional steel formwork |
|---|---|---|
| Support points needed per mould | One support point | Many support points |
| Setup | Beams & moulds ready to use; fewer workers needed | More labour-intensive setup |
| Concrete finish | Overlapping sheets leave no gaps — guarantees strength & appearance | Gaps possible at joints |
| Dismantling | Light components, safe to remove | Heavy metal moulds, higher risk |
| Transport off site | 1 truck | 4 trucks |
| Storage footprint | Compact, easily stacked | Large storage area required |
The same report is candid about a real trade-off on this project: CORCON's wood end-stabilisers and overlap supports used roughly twice the timber of the traditional system, plus extra wire and screws to fix the blocks in place. The engineer's own conclusion: CORCON delivered “an obvious significant increase in quality, timeliness and efficiency and thus of the economic benefit.”
Project Report — ShanShuiMingYuan First Phase, Qingdao
China Civil Engineering Construction Company, Qingdao Branch
Report dated 24 October 2003
Submitted to Design Construct Industries


Featured in Mmegi, under the banner “Botswana Today, Africa Tomorrow.”
CORCON's work on site in Gaborone was covered by Mmegi, one of Botswana's national newspapers, in a 2014 feature on the system in use — from sheet placement and propping through to the concrete pour.
The same propping, sheet-overlap and strip-and-reuse sequence documented on The System page was followed on site in Botswana — CORCON's corrugated steel sheets lifted into place by the local crew, reinforcement laid over the formwork, and concrete placed directly onto the sheets ahead of stripping and re-use further along the job.
“Botswana Today, Africa Tomorrow” — Mmegi
Keikantse Lesemela, Reporter
Kabo Mpaetona, Photographer
Mmegi, 2014

On site in Gaborone, during the Mmegi feature’s visit.

Placing concrete over the CORCON formwork.

Lifting a CORCON sheet into place.

Reinforcement laid over the CORCON formwork, ready for the pour.

The Botswana project under construction.

CORCON formwork laid out over the foundation.
A 200-tonne, 7-level pagoda — redesigned and built within budget, five years ahead of schedule.
Over roughly 8 years, Andy Stodulka provided structural engineering, design and construction supervision — in a probono role — for the Sakyamuni Buddhist Centre and its 7-level pagoda in Lyneham, ACT, working alongside a crew of 5 volunteer Vietnamese craftsmen.
Each of the pagoda's 7 roof sections was cast, fully tiled and decorated on the ground, then lifted into position by crane within hours — letting the volunteer crew work safely from inside the building with no external scaffolding, and saving years of time and hundreds of thousands of dollars in scaffolding costs.
With the completed pagoda weighing over 200 tonnes, Andy reanalysed the foundation design and recommended an additional column, taking the original 4-column design to 5. Structural works that might otherwise have taken years, or never been finished, were completed within months.
From his own knowledge of pagoda construction, the centre's founding president described Andy's solution as totally inventive and unique — not just an engineering fix, but a construction methodology developed through Andy's study of building history and experience across Asia, the Middle East, the UK and Africa, alongside his graduate and postgraduate studies at the University of Sydney.
“Instead of taking years or never, the structures were completed within months with a crew of 5 artisan volunteers.”
Most Ven. Thich Quang Ba — Founding President, United Vietnamese Buddhist Congregation of Canberra & Surrounding Districts
Sakyamuni Buddhist Centre, Lyneham ACT
Most Ven. Thich Quang Ba, Most Venerable
Founding President, UVBC of Canberra & Surrounding Districts
Incumbent Abbot, Van Hanh Monastery
Dated 30 October 2025


Other recent DCI project sites.
Additional photography from other current DCI project sites, included for a fuller picture of the company's ongoing construction work. These images show general site activity and are not presented as showing the CORCON formwork system in use — for CORCON hardware on site, see The System.