Technical reference

Design considerations, span and load charts.

CORCON is a hybrid multi-ribbed slab and beam system that uses the best properties of a slab, with beams to stiffen it and reduce deflection. This page carries the original technical manual's design notes and its simple design load and span charts, for engineers and specifiers sizing a floor.

Design considerations

Five things to know before you size a rib.

01

Shear

The shear requirements are no different from a normal slab system, and the ribs themselves do not require shear stirrups.

02

Span & loading range

CORCON can be applied to any span and loading. Telescopic beam moulds and inserts vary the rib depth from a nominal 50 mm depression up to 300 mm deep for extra-heavy loads or spans over 8–9 m.

03

Extending span

By reducing the rib spacing from 1,200 mm and using continuity and post-tensioning, spans can be increased to 14 m.

04

Short spans

Small spans of around 3 m can use CORCON with a “flat” insert mould.

05

Primary beams

Primary beams can be designed as upstand beams where suitable, allowing continuous laying of CORCON ribs.

Simple design load and span charts

Allowable superimposed live load by beam depth and span.

Rib beams sit 1,200 mm apart, and what a floor can carry comes down to two things working against each other — how deep the beam is, and how far it has to span between supports. A deeper beam, or a shorter span, carries more; stretch the span without adding depth and the capacity falls away. The usual fix isn't to stop there: going deeper, or tensioning steel strand through the beam before it takes any load (post-tensioning), gets a long span back up to a proper working load again.

Allowable superimposed live load — representative curves

Single span, 1.5-hour fire rating. Three common beam depths. Representative shape of the tested figures, not a substitute for the full tables.

0 2 4 6 8 10 Allowable live load (kPa) 5 6 7 8 9 10 11 Span (m) typical office floor — 3–5 kPa light / roof load — ~1 kPa post-tensioning adds reach
200 mm beam250 mm beam300 mm beampost-tensioned extension
Independently tested & verified
CSIRO
Fire testing to AS 1530.4 and acoustic testing to AS 1276 for the original design manual.
University of Melbourne
Structural load testing and verification of the rib / beam system.
China Academy of Building Research
Independent load testing in Beijing for the CORCON–CABR joint venture.

Figures were prepared to the Australian standards in force at the time — always check them against current standards before use.

Single span — 1.5-hour fire rating

This is the main case used through most of this guide, and the rating the system is most commonly specified to: a bay resting on supports at both ends, like a single room, protected for 1.5 hours in a fire. A mid-depth beam over a moderate span comfortably carries a typical office floor — desks, filing cabinets, people moving around. Push that same beam noticeably further and the allowance drops right down, to a fraction of what even a lightly used room needs — which is exactly where a deeper beam or post-tensioning takes back over, recovering a proper office-level load even at the longer span.

Key figures

Beam depth
250 mm
Span
7.0 m
Live load
5.0 kPa
With PT
+2 m span

Single span — 0.5-hour fire rating

The same simply-supported arrangement, but built to a lighter, 0.5-hour fire protection instead of 1.5 hours. Less fire protection means less concrete cover is needed, so for a given span the beam can often be shallower than the 1.5-hour tables call for — worth considering wherever a project's fire engineer confirms the lower rating is acceptable.

Key figures

Cover
~75 % of 1.5hr
Beam depth
shallower
Use when
fire eng. OKs

Continuous span — 1.5-hour fire rating

Here the rib carries on over an in-between support instead of stopping and starting at every bay, which is more efficient — it reaches further for the same beam depth, at the cost of a small, predictable amount of extra sag. A 300 mm beam in this arrangement reaches out to a 10.5 m span carrying a light, roof-type load, sagging by only about 1/300th of that length — roughly 35 mm over the full 10.5 m, not something anyone standing in the room would notice. It's the arrangement specifiers reach for on longer runs, such as warehouse floors or car parks.

Key figures

Beam depth
300 mm
Span
10.5 m
Deflection
~35 mm (1/300)
Typical use
warehouse / car park

The full span and load tables — every beam depth, bar schedule and exact kPa figure tested — are available to engineers and specifiers sizing an actual floor.

Technical briefing

Talk to CORCON’s inventor.

For the full span tables, patent certificates, CSIRO/University of Melbourne test reports, or to discuss a specific project — contact Andy Stodulka directly. No form, no gatekeeper.

Phone
0411 725 886

Andy replies personally — usually within one business day.