Field installation guide

Installing CORCON is simple and repetitive.

This guide reproduces the CORCON field manual's installation sequence — setting up, installation details for non-standard cases, services and pouring, stripping, and care of the formwork between reuses. We recommend the whole installation is supervised and certified by the on-site engineer or supervisor; refer to the design engineer in case of doubt.

Setting up

Eight steps from support frame to reinforcement, before the pour.

Bar sizes, mesh grade, and any post-tensioning ducts follow the project's structural drawings; see Design & Specs for the standard span and reinforcement tables this system is built around.

  1. 01

    Support each pair of beams on one pair of 1,200 × 2,400 mm frames.

  2. 02

    Place 150 × 100 mm scaffolding timber beams on the frames at 2,400 mm centres, running across the beam span.

  3. 03

    Nail the CORCON beam-mould support brackets to the timber at 1,200 mm centres.

  4. 04

    Place the CORCON moulds into the brackets. Butt moulds up to primary beams or walls with appropriate support, or incorporate them into other load-bearing elements as detailed or directed by the engineer.

  5. 05

    Overlap mould sections by at least 400 mm wherever two or more sections form a single beam.

  6. 06

    Place the corrugated sheets onto the supporting edge of the moulds, overlapping each sheet by at least two corrugations — with the last corrugation pointing down to stop concrete seeping through.

  7. 07

    Place reinforcement. Y16 bars or post-tensioning ducts go in the bottom of the beam moulds; F72 or F82 mesh runs across the top of the slab, with additional top reinforcement over primary beams as shown on the plans.

  8. 08

    Spray the deck with form-release agent to make stripping easier.

Photograph of CORCON beam moulds and corrugated sheets installed on scaffolding at a construction site, with reinforcement steel visible in the completed bay behind
Beam moulds and corrugated sheets in place, propped and ready for reinforcement and the concrete pour.
Photograph of construction workers in hard hats tying top reinforcement steel over CORCON formwork sheets on a busy urban construction site in Kuala Lumpur
Tying top reinforcement steel over CORCON formwork on a project site in Kuala Lumpur.
Installation details

Standard solutions for beam ends, odd rib spacing, and the last sheet.

These are the configuration options the field manual carries for the cases that come up on most sites — where the standard 1,200 mm module doesn't divide evenly, or a run needs to be closed off cleanly.

Quick guide
Standard arrangement Bottom mould Top mould 3,000 mm 2,700 mm 200 mm clearance to allow removal Min. 200 mm overlap 5.5 m total span Longer-span layout — 7,900 mm run 2,800 2,800 2,800 (on top) 250 mm 250 mm 7,900 mm total span The amber middle mould is also 2,800 mm long. It sits on top of the two blue outer moulds, overlapping each by 250 mm — 2,300 mm of it stays exposed between the overlaps.
Key numbers at a glance: mould lengths, clearances, and the longer-span breakdown.
Quick guide — Animated
Step 1 — place the 1st mould in each bay Step 2 — place the 2nd, overlapping it 1st 2nd 2nd 1st 1st 2nd 7,000 mm span — alternated to even the spacing out
Watch the lay order: 1st then 2nd mould/sheet in each bay, alternated bay to bay.
Quick guide
Three end-plate builds — section through the fixing brackets Each plate is held between two stepped brackets that hook over the top edge and clamp to the primary beam / adjacent mould PLY lightweight, one-off or short-span 1,200 mm 50 mm plywood sheet METAL & TIMBER reusable — 2 mm metal mould + timber infill 1,200 mm 300 + 50 mm 2 mm metal mould timber infill ALL METAL fully reusable, compact 300 mm module 300 mm 50 mm crown 150 mm sides metal profile All three types fit between a primary beam (or adjacent mould) at each end. The stepped red bracket hooks over the plate’s top edge and bolts down — same mounting pattern regardless of plate type.
Three end-plate builds with their fixing-bracket detail — section view.
Quick guide
PreferredPlan view of the preferred arrangement: a flat slab with two 1200 millimetre arched voids on top, three trapezoidal beam drops hanging below, and a shorter less-than-900 millimetre section against the end wall.

Two full 1,200 mm beam bays plus a shorter <900 mm end bay against the wall.

AlternatePlan view of the alternate arrangement: a flat slab with two red arched voids on top, two full beam drops below plus a small offcut stub at the right end against the wall. Caption reads Offcut reused, min. 200 mm wide.

An offcut, at least 200 mm wide, reused against the opposite wall.

Plan-view arrangements for an uneven end bay against a wall — preferred layout first, with the alternate on the right.
Quick guide
End Mould / Primary Beam Primary Beam / End Mould 1st LAST extra overlap 7,000 mm span Lay left to right — the last sheet closes against the Primary Beam with additional overlap at that end.
Lay order: first, then the last corrugated sheet against the primary Beam with additional overlap.
Quick guide
Pour sequence — section through two adjacent bays Continuous numbering across bays: moulds, then corrugations, then the slab topping on top of everything BAY 1 BAY 2 concrete slab topping — poured last, covers both bays as one pour Primary beam Primary beam Primary beam 1 2 3 4 5 6 7 8 9 10 pour steps proceed sequentially, bay-by-bay 7,000 mm (Bay 1) 7,000 mm (Bay 2) LEGEND N Pour sequence step Primary beam (pre-cast) Beam mould (concrete-filled) Corrugated sheet Bracket / fixing Each red number is one discrete pour operation. Pour all three beam moulds in a bay first (1–3), then the corrugations between them (4–5), then repeat for the next bay (6–10). The slab topping is poured over both bays together as the final operation.
Section view of the pour sequence across two adjacent bays — numbered step by step.
Services, fixings & pouring

Built-in service runs, clean beam connections, and a pour sequence that keeps concrete where it belongs.

Pour sequence
  1. 01

    Place the primary beams first.

  2. 02

    Fill the beam moulds next.

  3. 03

    Fill the corrugations last, starting with the top-most sheet. Vibrate concrete of no more than 100–120 mm slump into the rib beams.

01

Beam angles & damaged ends

Form beam angles by mitring the bottom moulds as required and bridging any remaining space with plywood. Damaged mould ends can simply be trimmed square rather than discarded.

02

Connections to transfer beams

Steel plates or cut plywood end moulds ensure the beams connect neatly into transfer beams.

03

Penetrations

Fire collars, ducting and other penetrations are simple to incorporate, both in the beam moulds and through the upper surface.

04

Ceiling fixings

Fixings can be built in with bolts and timber battens set into the bottom of the moulds, or added later with power-actuated tools — with 50% fewer fixing points needed than a conventional system.

Stripping

Five steps to strip the formwork for reuse, without damaging it.

  1. 01

    Lower the scaffolding just ahead of the CORCON to a comfortable working height — at least 400–600 mm.

  2. 02

    Remove the bottom mould first by tapping it to break the vacuum bond, assisted by a timber or steel wedge so the ends aren't damaged — or break the bond with an air-compressor hose inserted through a grommet in the bottom of the beam. Clean, oil and stack the mould.

  3. 03

    Free the top mould. It's locked in by a thin feather of concrete along its edge, which may need cleaning away with a chisel and hammer. Tap the mould to break the suction, lever it down with a wedge, then clean, oil and stack it.

  4. 04

    Repeat for the adjacent beams.

  5. 05

    Take the corrugated sheets down carefully as they come loose. Peel off the first sheet placed, pass it down, clean, oil and stack it ready for reuse. Slightly damaged sheets can be tapped or panel-beaten back into shape.

Care of the product

Handling and storage that determines how many times the formwork gets reused.

  1. 01

    Handle with care Do not drop components — especially on their ends and edges.

  2. 02

    Reuse damaged ends Damaged beam-mould ends can be cut down and the moulds reused for smaller spans, rather than scrapped outright.

  3. 03

    Protect the sheets Use walkway planks to protect the corrugated sheets from local damage and denting. Sheets that flatten out can still be used as permanent formwork — for example, bridge decks with post-tensioned or steel beams at no more than 1,200 mm gaps.

  4. 04

    Check the brackets Check the mould brackets for alignment and for the correct gap to hold the beam mould.

  5. 05

    Store properly Store components in the dedicated crates — the longer CORCON formwork lasts, the greater the cost efficiency across a project. See Benefits & Savings for the full picture of what formwork reuse is worth over a build.

Technical briefing

Talk to CORCON’s inventor.

For span tables, the patent certificates, the full technical pack, or to discuss a specific project — contact Andy Stodulka directly. No form, no gatekeeper.

Phone
0411 725 886

Andy replies personally — usually within one business day.