Beam angles & damaged ends
Form beam angles by mitring the bottom moulds as required and bridging any remaining space with plywood. Damaged mould ends can simply be trimmed square rather than discarded.
This guide reproduces the CORCON field manual's installation sequence — setting up, installation details for non-standard cases, services and pouring, stripping, and care of the formwork between reuses. We recommend the whole installation is supervised and certified by the on-site engineer or supervisor; refer to the design engineer in case of doubt.
Bar sizes, mesh grade, and any post-tensioning ducts follow the project's structural drawings; see Design & Specs for the standard span and reinforcement tables this system is built around.
Support each pair of beams on one pair of 1,200 × 2,400 mm frames.
Place 150 × 100 mm scaffolding timber beams on the frames at 2,400 mm centres, running across the beam span.
Nail the CORCON beam-mould support brackets to the timber at 1,200 mm centres.
Place the CORCON moulds into the brackets. Butt moulds up to primary beams or walls with appropriate support, or incorporate them into other load-bearing elements as detailed or directed by the engineer.
Overlap mould sections by at least 400 mm wherever two or more sections form a single beam.
Place the corrugated sheets onto the supporting edge of the moulds, overlapping each sheet by at least two corrugations — with the last corrugation pointing down to stop concrete seeping through.
Place reinforcement. Y16 bars or post-tensioning ducts go in the bottom of the beam moulds; F72 or F82 mesh runs across the top of the slab, with additional top reinforcement over primary beams as shown on the plans.
Spray the deck with form-release agent to make stripping easier.


These are the configuration options the field manual carries for the cases that come up on most sites — where the standard 1,200 mm module doesn't divide evenly, or a run needs to be closed off cleanly.

Two full 1,200 mm beam bays plus a shorter <900 mm end bay against the wall.

An offcut, at least 200 mm wide, reused against the opposite wall.
Place the primary beams first.
Fill the beam moulds next.
Fill the corrugations last, starting with the top-most sheet. Vibrate concrete of no more than 100–120 mm slump into the rib beams.
Form beam angles by mitring the bottom moulds as required and bridging any remaining space with plywood. Damaged mould ends can simply be trimmed square rather than discarded.
Steel plates or cut plywood end moulds ensure the beams connect neatly into transfer beams.
Fire collars, ducting and other penetrations are simple to incorporate, both in the beam moulds and through the upper surface.
Fixings can be built in with bolts and timber battens set into the bottom of the moulds, or added later with power-actuated tools — with 50% fewer fixing points needed than a conventional system.
Lower the scaffolding just ahead of the CORCON to a comfortable working height — at least 400–600 mm.
Remove the bottom mould first by tapping it to break the vacuum bond, assisted by a timber or steel wedge so the ends aren't damaged — or break the bond with an air-compressor hose inserted through a grommet in the bottom of the beam. Clean, oil and stack the mould.
Free the top mould. It's locked in by a thin feather of concrete along its edge, which may need cleaning away with a chisel and hammer. Tap the mould to break the suction, lever it down with a wedge, then clean, oil and stack it.
Repeat for the adjacent beams.
Take the corrugated sheets down carefully as they come loose. Peel off the first sheet placed, pass it down, clean, oil and stack it ready for reuse. Slightly damaged sheets can be tapped or panel-beaten back into shape.
Handle with care Do not drop components — especially on their ends and edges.
Reuse damaged ends Damaged beam-mould ends can be cut down and the moulds reused for smaller spans, rather than scrapped outright.
Protect the sheets Use walkway planks to protect the corrugated sheets from local damage and denting. Sheets that flatten out can still be used as permanent formwork — for example, bridge decks with post-tensioned or steel beams at no more than 1,200 mm gaps.
Check the brackets Check the mould brackets for alignment and for the correct gap to hold the beam mould.
Store properly Store components in the dedicated crates — the longer CORCON formwork lasts, the greater the cost efficiency across a project. See Benefits & Savings for the full picture of what formwork reuse is worth over a build.